Delivering Reconstruction and Infrastructure Solutions Worldwide
Products: Modular Flat-Pack Container Houses
In cooperation with the Iraqi Ministry of Education, Texin delivered 120 modular classrooms to replace damaged schools in Mosul and Basra. The units were installed in 4 months, providing safe learning environments for over 5,000 students.
Products: Collapsible Container Houses
800 foldable units were deployed across Lviv and Kyiv regions to provide temporary housing for internally displaced persons. The quick setup (15 minutes per unit) allowed immediate occupancy.
Products: Bailey Bridge
After the earthquake in West Sulawesi, Texin supplied a 30-meter Bailey bridge to reconnect isolated villages. The bridge was assembled in 72 hours, restoring access for 15,000 residents.
Products: Steel Structure Workshop, Dust Collectors
A 5,000m² steel structure workshop was added to a mining equipment manufacturer in Nur-Sultan. The project included dust collection systems to meet environmental regulations.