Steel Strength for Rapid Reconstruction

Rapid Deployment Steel Structures · Permanent Buildings & Industrial Frames · Energy & Transport Steel · Components & Accessories
GOST compliant, EAC certified, global delivery

Get Quote View Products

About Us

Jinan Texin Steel Co., Ltd. is a professional supplier integrating steel structure manufacturing and emergency equipment production.

We focus on providing strong, rapidly deployable solutions for post-war reconstruction, infrastructure repair, industrial projects, and humanitarian aid.

With over 12 years of experience, our products are widely used in the Middle East, Europe, Central Asia, and Southeast Asia. We strictly implement ISO 9001:2015, AWS D1.1, EN and other international standards, ensuring 100% quality inspection for every component.

Our manufacturing base is in Jinan, Shandong, equipped with CNC cutting lines, welding robots, and a full traceability system. Founded in 2011, our business integrates two core divisions: prefabricated steel building products and emergency infrastructure equipment.

We provide one-stop service from design, fabrication to delivery.

Texin – Durable, Deployable, Responsible Engineering Solutions.
Corporate mission: Innovation · Rapid Reconstruction · Clean Energy · Safety & Environment · Mutual Benefit

Why Texin for Your Region?

  • ✔ 15+ years exporting to conflict-affected & post-war regions
  • ✔ ISO 9001:2015 + AWS D1.1 welding certification
  • ✔ Engineer team available for extreme climate adaptation (heat or cold)
  • ✔ 100% on-time delivery to 40+ countries including Ukraine & Iraq
  • ✔ Flat-pack & collapsible designs – ready for air/sea/truck dispatch within 7 days
  • ✔ 24/7 multilingual support (English, Russian)
ISO 9001EN 1090AWS D1.1GOSTEAC

Products

Ⅰ. Rapid Deployment Steel Structures

Bailey Bridge – Modular Steel Truss Bridge for Emergency Crossings

Bailey Bridge / Prefabricated Steel Bridge

Modular truss, bolted assembly, hot-dip galvanized.
  • Rapid deployment: 3-7 days
  • Span up to 60m
  • Resistant to -40°C
Bailey bridgeБыстровозводимый мост
Details →
Modular Container House – Flat-Pack Prefab Housing for Worker Camps

Modular Container House (incl. Foldable)

Prefab container units, stackable to 3 stories; foldable versions.
  • Flat-pack, 2-person assembly in 2h
  • Optional insulation, pre-wired
modular container houseМодульные контейнерные дома
Details →
Large-Span Shelter – Column-Free Temporary Warehouse and Hangar

Large-Span Shelter / Temporary Hangar

Column-free spans 10-50m, fabric or steel sheet cover.
  • For hangars, warehouses, equipment storage
  • Wind & seismic resistant, reusable
large-span shelterБыстровозводимый ангар
Details →

Ⅱ. Permanent Buildings & Industrial Frames

Steel Bridge – Permanent Highway and Railway Steel Bridge

Steel Bridge / Highway & Railway Steel Bridge

Welded or bolted permanent bridge, GOST & SNiP compliant.
  • For roads, railways, industrial crossings
  • Freeze-thaw resistant, 50+ years life
steel bridgeСтальной мост
Details →
Steel Frame Building – Industrial Factory and Commercial Building Frame

Industrial & Commercial Steel Frame

H-beam or truss for factories, warehouses, shopping malls.
  • Max clear span 40m, seismic grade 8
  • Prefabricated, 30% faster construction
steel building frameМеталлокаркас здания
Details →

Ⅲ. Energy & Transport Specialized Steel

Steel Tower – Power Transmission and Communication Tower

Towers (Power/Communication/Flare)

Self-supporting or guyed steel towers, hot-dip galvanized, height up to 120m.
  • IEC, ANSI or GOST compliant
  • For power lines, telecom, flare stacks
transmission towerБашенные конструкции
Details →
Industrial Chimney – Self-Supporting Steel Chimney for Boilers

Industrial Chimney

Self-supporting or guyed steel chimney, acid-resistant lining available.
  • Height 20-150m for boilers, metallurgy, chemical plants
  • Low-temperature design
industrial chimneyСтальные дымовые трубы
Details →
Steel Platform – Equipment Access and Observation Tower

Steel Platform & Observation Tower

For equipment access, maintenance, fire watch.
  • With ladders and safety railings
  • Hot-dip galvanized or painted, anti-slip
steel platformСтальные платформы
Details →

Ⅳ. Components & Accessories

Steel Fabrication – Custom Beams, Columns and Components

Steel Component Fabrication (Beams/Columns/Bracing)

Custom welded or hot-rolled components per drawing.
  • Materials Q235B/Q355B, EN standard available
  • High precision, NDT tested
steel fabricationМеталлоконструкции на заказ
Details →
Guardrail and Steel Grating – Stair Treads and Platform Walkways

Guardrails & Steel Grating

Stair treads, platform walkways, trench covers, hot-dip galvanized.
  • Load ratings optional, OSHA compliant
  • Anti-slip, corrosion resistant
guardrailsОграждения
Details →
Anchor Bolts – High-Strength Embedded Bolts for Foundation

Anchor Bolts & Embedded Parts

Grade 8.8/10.9 high-strength bolts, adaptable to Russian standards.
  • Hot-dip galvanized, EAC certified
  • Anchor plates, positioning plates custom
anchor boltsАнкерные болты
Details →
Non-Standard Steel Equipment – Custom Hoppers and Supports

Non-Standard Steel Equipment

Custom hoppers, chutes, equipment supports, tanks – process steel structures.
  • Abrasion and corrosion resistant materials
  • For mining, metallurgy, chemical industries
non-standard equipmentНестандартное оборудование
Details →
Steel Pipe Piles – SSAW and LSAW Piles for Deep Foundation

Steel Pipe Piles

Spiral or straight seam pipe piles for permafrost and soft soil foundations.
  • Diameter 300-1200mm, custom length
  • Suitable for Siberia permafrost regions
steel pipe pilesСтальные сваи
Details →

* All products applicable for post-war reconstruction, disaster relief, infrastructure renewal & industrial upgrades. GOST compliant, EAC certified.

News More →

Siberia Bailey Bridge

Bailey Bridge Supports Siberian Emergency Route

2026-03-15

Texin supplied a 45m Bailey bridge to Siberia, installed in 5 days at -40°C.

Read more →
Middle East Modular Housing

200 Modular Container Houses Shipped to Middle East

2026-02-20

Fast deployment of 200 container houses for post-war temporary settlement.

Read more →
Vietnam Steel Workshop

12,000㎡ Steel Workshop Completed in Haiphong, Vietnam

2026-01-15

Texin delivered a heavy steel workshop of 12,000㎡ with crane runway in just 65 days.

Read more →

Projects More →

Uzbekistan Bridge

Uzbekistan Bailey Bridge Project

📍 Central Asia · Uzbekistan | 2025

45m single-lane Bailey bridge installed in 7 days for post-disaster logistics.

Details →
Turkey Earthquake Housing

Turkey Post-Earthquake Temporary Housing

📍 Turkey · Kahramanmaraş | 2024

500 foldable container houses delivered for disaster victims.

Details →
Kenya Power Tower

Kenya Power Transmission Tower Upgrade

📍 Africa · Kenya | 2025

30 units of 110kV transmission towers for rural grid expansion.

Details →
Vietnam Workshop

Vietnam Haiphong Steel Workshop

📍 Southeast Asia · Vietnam | 2025

12,000㎡ total area with crane runway, delivered in 60 days.

Details →

Contact Us

We will reply within 24 hours. For urgent inquiries, please contact us via WhatsApp or Telegram.

📞 +86 18917388828
✉️ wanghu8828@outlook.com
✉️ 676422995@qq.com

📍 Songjiang Steel Market, Songjiang District, Shanghai, China

WhatsApp Telegram Facebook

* We will reply via email after submission.